| |
|
|
1. Water fitting size?
- e.g.; 1/8 BSP, ? BSP,
3/8
BSP, 1/4 NPT… |
|
|
|
|
|
Are
counter bores required?
Please detail on drawing. |
|
No
Yes |
| |
| |
2. Air fitting size (for valve gates only)?
-
e.g.; 1/8 BSP, ? BSP, 3/8 BSP, 1/8 NPT |
|
|
|
|
|
Are
counter bores required?
Please detail on drawing |
|
No
Yes |
| |
| |
| 3. Please select electrical connectors. |
|
Power
(male) |
|
|
|
|
|
|
|
| |
| |
| 4. Please select type of latches: |
|
Single
Double |
| |
|
|
| 5. Please state preferred wiring
sequence: |
|
|
| |
| |
| 6. Please select type
of termocouple |
|
J type
K type |
| |
| |
| 7. What is the required sprue bush radius? |
|
|
| |
| |
| 8. What is the required locating ring diameter? |
|
|
| |
| |
|
|
|
9. Please supply a drawing, model or sketch showing a plan view, front and
side elevation of the Hot Half and complete the check list below for
required inclusions.
|
|
|
|
|
|
|
| |
10. Contact
details:
|
|
|
|
|
|
|
|
| Attach drawing (Maximum file size is 2MB) |
|
|
|
|
|
|
| |
|
|
| |